The CIP Project Manual is intended to be a guide for all designers, both consultant and in-house staff. The manual assists the designer to better understand the scoping, design, and construction support processes of CIP projects. It is intended to be used in conjunction with the A&E standards and other requirements contained in the Design portion of the SCA website. The Forms link will direct you to the Forms page, on which there are links to CIP Forms, Project Information Documents and Sample Certification Letters, all of which are used for CIP projects.
The SCA has implemented required ADA Path of Travel obligation in scoping of all projects, which is described in the ADA Path of Travel Compliance Scoping Guideline. To view the training presentation, click on the link below:
The SCA has created a protocol to be followed for projects with artwork that is part of the Public Art for Public Schools (PAPS) collection to ensure the artwork is adequately protected against damage during the project. Below are links to the protocol and flowchart to be followed for all CIP projects. There is also a flowchart of the process to be followed when there is artwork at a school that is not part of the PAPS collection.
Below the manual and forms links are a link to the Scoping Guidelines, which provide approaches to the scoping and design of different categories of projects, and CIP exhibits, some of which are referenced in the manual.
Any questions related to these standards and procedures should be forwarded via email to CADD Unit
The BIM Guidelines and Standards for Architects and Engineers represent the BIM guidelines and standards to be used by all designers, both consultant and in-house staff, for new capacity projects when so directed by the Authority. The standards and procedures discussed are based on Autodesk Revit and other BIM related software used by the Authority. The guidelines will be revisited as the Authority continues to work with its staff and design partners to utilize the potential of the system.
The CADD Manual represents the CADD management and other standards to be used by all designers, both consultant and in-house staff. The standards and procedures discussed are based on AutoCAD Release 2010 and other software used by the Authority. They will be revisited as the Authority adopts new versions of the software and/or revises current standards.
{{doc.SectionText}}
{{subSection.Category}}
{{subSection.SectionText}}
The A&E Guide for Capacity Project Management was created for use by DM's and DPM's as a guide for managing Capacity Projects. It provides an organized approach to efficiently collaborate and coordinate with other SCA departments and outside entities in the delivery of these projects. Please provide any feedback you may have on the guide or the planning guidelines to your Director, DM and/or the CADD Unit.
.
Below are links to Planning Guidelines which provide recommendations for different types of capacity projects. The Forms link will direct you to the Forms page, on which there are links to Capacity Forms, Project Information Documents and Sample Certification Letters, all of which are used for capacity projects